Search RPD Archives
[AfriNIC-rpd] Proposed text change for AFPUB-2010-v4-005-draft-04
sm+afrinic at elandsys.com
sm+afrinic at elandsys.com
Wed Jun 8 14:57:23 UTC 2011
Hello,
I am sending this text on behalf of Alan Barrett as he does not have
email access at the moment:
Replace section 3.8 with the following text:
3.8. Allocation Criteria
3.8.1. In order to receive IPv4 allocations or assignments during
the Exhaustion Phase, the LIR or End User must have used at least 90%
of all previous allocations or assignments (including those made
during both the Current Phase and the Exhaustion Phase). In the case
of new LIRs or End Users with no previous allocations or assignments,
this requirement does not apply to their first allocation or
assignment request.
*** including Legacy Space?
3.8.2. AfriNIC resources are for the AfriNIC service
region. However, organisations that are based in Africa may also
have equipment outside Africa, and there is a need for address space
to support such equipment. In order to meet these goals the
following requirement is made:
Any organisation that requests or receives IPv4 address space during
the Exhaustion Phase, must use more than half of their IPv4 address
space in the AfriNIC region. In determining what fraction of their
IPv4 address space is in use in the AfriNIC region, all relevant
address space shall be taken into account, including Legacy Address
Space, and address space obtained from AfriNIC or any other RIR
before or after the beginning of the Exhaustion Phase. All such use
of address space outside the AfriNIC region shall be in support of
connectivity for the AfriNIC region.
Regards,
S. Moonesamy
More information about the RPD
mailing list